新疆11选5

Sinovel (Wuhan) New Energy Equipment Co., Ltd. Site map | Contact Us

PV Micro-net mains complementary system--Wuhan Polytechnic University

Views : 331
Date Posted : 2018-03-07

PV Micro-net mains complementary system

initpintu_副本.jpg

Project Description:

1. Project address: Wuhan Polytechnic University

2, Installed Capacity: 2-kilowatt

3, put into production time: August 2016

4, Project Overview: The system contains PV modules, bus boxes, mains complementary control inverter, 48v200ah storage batteries, stents and other accessories

5, System operation mode: The system can operate independently, but also with the power grid complementary operation. Under the condition of generating electricity, the direct supply load of PV is used. If there is excess electricity, the surplus charge into the battery standby, such as insufficient electricity, then automatically switch to the normal supply of electricity.

新疆11选56. Annual Power Generation: 2190KWh




新疆11选5 [Tags] :

Recommend

Related


新疆11选5_官网 新疆11选5|官方唯一指定! 新疆11选5---新疆11选5_欢迎您 新疆11选5-新疆11选5 新疆11选5---新疆11选5_欢迎您 新疆11选5_官网 新疆11选5_安全购彩 新疆11选5-新疆11选5